For daycares & preschools
Play areas planned around age groups.
A daycare playground is more than a play area: children move there every day, and teachers supervise there every day. We design with both in mind.
Request a project quoteOur approach
- Zoning by ageSeparate areas for toddlers, preschoolers and school-age kids, with clear transitions and sight lines.
- The teacher’s viewOpen structures without hidden corners or blind spots.
- Group flowLoop routes shorten lines and spread the crowd.
- Surfacing & use zonesSurfacing and use zones are part of the plan, based on fall height and CPSC / ASTM guidance.
Project stages
- 01
Site visit
We measure the site and look at the existing ground, drainage and surroundings.
- 02
Design
Age zoning, equipment selection, use zones and surfacing.
- 03
Approval
Plan and scope signed off with your director, board or management.
- 04
Production
Built to the approved design.
- 05
Installation
Ground prep, surfacing and assembly.
- 06
Documents & care
Handover documents, inspection checklists and a maintenance plan.
Timelines: TODO — confirmed per project.
The Grove series
Structures planned around age groups. Every project is adapted to your site.
- Home series
- Backyard series
- Grove series · daycare
- Grove series · daycare
What you get at handover
- Site layout plan and installation drawings
- Use, inspection and maintenance instructions
- Documentation to support your licensing review — TODO: confirm scope (e.g. Massachusetts EEC)
- Test reports and certificates — TODO: which documents will be provided
- Warranty certificate — TODO
Request a project quote
Tell us about your site; we’ll review it and get back to you.